Five One Five Condominiums

Five One Five luxury full-floor residential condominium development is one of the early properties along High Line Park in West Chelsea, Manhattan. It is currently under construction with completion anticipated in mid-2018.

With Mc Gowan serving as Project Manager, the project scope calls for the addition of a new 11-story residential tower containing twelve luxury condominium units where the newly erected tower floors will be constructed atop an existing industrial property that has been structurally reconfigured.

The structure is incorporating and being built on top of what was once a six-story factory. The new 32,000 sq ft property is configured with double-height ceilings in the 2,200 sq ft half-floor and 4,400 sq ft full-floor units. The ground floor level will offer 4,600 sq ft of commercial space.

Features include a custom steel and glass façade inspired by the High Line Park's sweeping pedestrian walkway bend. The luxury residential units incorporate bleached oak floors as well as bronze detailing with hints of stone, wood, cotton, linen and leather throughout.  The kitchens contain Miele appliances and blond oak cabinetry. Five-fixture bathrooms include standalone bathtubs, Azul limestone walls, lava stone floors and custom designed hardware. 

Five One Five will offer residents ameneties such as expansive outdoor spaces on each floor, a private elevator that opens directly into each residence, a chef’s kitchen for catering, a state-of-the-art gym with steam room and a ground floor gallery space.  

Project Details

Client:

Forum Absolute Capital Partners

Property Address:

515 West 29th Street
New York, New York

Project Size:

36,400 square feet

Project Value:

30 million

Completion Date:

Anticipated Mid 2018

Architect:

SCDA Architects

Services Provided:

Construction Management

Project Type:

Ground-Up

Division:

Ground-Up

Industry:

Residential